top of page
Central Wastewater Treatment Plant Chlorine Basin and Hydraulic Improvements
Phase I – APM performed civil engineering, site drainage plans, yard piping plans and the access road replacement for a new chlorine basin at the facility. Phase II – APM provided civil engineering design services for the installation of approximately 4000 LF of a new 72-inch Peak Flow By-Pass Line. The new line traversed from the existing inflow line on the North side of the Plant to Peak Flow Basin B. This project included new bypass valves and vaults and underground utility investigations to minimize conflicts with existing utilities during the construction.
Central Treatment
Central Treatment
1/1
bottom of page