APM & Associates provided structural engineering assistance to the Skylink Automated People Mover (APM) System project team. APM assigned five (5) full-time structural engineers to the endeavor.
APM was a part of the team that was contracted to perform engineering design services for the improvements to the existing Tom Braniff drainage channel.
Phase I – APM performed civil engineering, site drainage plans, yard piping plans and the access road replacement for a new chlorine basin at the facility.
APM was a member of a joint venture partnership, PGTS, selected by DART/ ACT 21 to provide professional, technical, managerial, administrative and other services required for the final design of a line section Southeast 2 (SE-2).