top of page
Wintergreen Road/Bridge
After a railroad intermodal facility in southern Dallas County prompted a lowering of some 4-feet of the existing railroad track, the nearby Wintergreen Road was forced closed. In a joint venture between APM, TxDOT, Dallas County and the Union Pacific Railroad, the relocation of Wintergreen Road resulted in a new alignment with 4-lane divided thoroughfare and a bridge over the Union Pacific rail yard. Our firm was instrumental in establishing inter-local agreements among the stakeholders to get this project completed.
![wintergreen](https://static.wixstatic.com/media/1fa948_d422c346c6b54b078de12c6cf3403ede~mv2.jpg/v1/fill/w_112,h_73,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1fa948_d422c346c6b54b078de12c6cf3403ede~mv2.jpg)
wintergreen
![wintergreen](https://static.wixstatic.com/media/1fa948_d422c346c6b54b078de12c6cf3403ede~mv2.jpg/v1/fill/w_112,h_73,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/1fa948_d422c346c6b54b078de12c6cf3403ede~mv2.jpg)
wintergreen
1/1
bottom of page