BRIDGE

STRUCTURE

APM & Associates, Inc., has a tremendous amount of experience designing bridges throughout the state of Texas. Our principals were instrumental in the design and construction of all of the bridges on US 75 in Dallas as part of the TxDOT team. We bring that extensive capability to all of our bridges contracts whether it be a small two-lane bridge over an existing creek to longer span, precast, post tensioned bridges for heavy highway or rail.

BRIDGE
PROJECTS
wintergreen.jpg

Wintergreen Road/Bridge

After a railroad intermodal facility in southern Dallas County prompted a lowering of some 4-feet of the existing railroad track, the nearby Wintergreen Road was forced closed.

South central .jpg

The City of Dallas identified the need to improve access to the South Central Addition of Dallas often interrupted at the Union Pacific Railroad (UPRR) crossing leading to the neighborhood.

dowdy.jpg

Dowdy Ferry Road Bridge Replacement (Hutchins, TX)

The Dowdy Ferry Road Bridge over the Trinity River is a main county arterial to an unincorporated area of Southern Dallas County.

wilmer.png

Wilmer Kissell Street Bridge Replacement (Wilmer, TX)

APM & Associates was selected as prime consultant by the Dallas County to prepare Plans, Specifications and Estimates (PS&E) for replacement of an existing bridge on Kissell Street over the Cottonwood Creek in the City of Wilmer.

HIGHWAY

ROADS

THOROUGHFARES

APM & Associates brings consistent and reliable experience in the design and construction of major highways and roadways across the entire state of Texas. Our strong understanding of both project requirements and our client’s needs and expectations has enhanced Texas’ state and local infrastructure, along with its regional mobility. APM has an excellent track record of delivering top-tier transportation projects on time and within budget.  From two-lane FM roadways to Interstate Highways, APM has the knowledge to provide services that span the entire spectrum of transportation infrastructure.

PROJECTS

Chalk Hill Road from Singleton Blvd. to West Davis

(Dallas, TX)

APM & Associates prepared Plans, Specifications and Estimates (PS&E) for the reconstruction of Chalk Hill Road, from West Davis to Singleton Boulevard- a project length of 2.02 miles.

F.P. Lucas Boulevard from McKenzie Drive to Cartwright Road (Mesquite, TX) 2005

APM & Associates was selected by Dallas County to complete Plans, Specifications and Estimates (PS&E) for the construction of F.P. Lucas Boulevard from McKenzie Drive to Cartwright Road in the City of Mesquite – a project length of 1.6 miles.

APM & Associates was selected by the Dallas County to complete the Plans, Specifications and Estimates (PS&E) for Singleton Boulevard reconstruction from Hampton Road to Canada Drive in West Dallas, a project length of 1.77 miles.

SPUR 348 at

Las Colinas Blvd.

APM was prime consultant for PS&E production of SPUR 348 at Las Colinas Blvd.  The project reconstructed an existing 4-lane roadway to a 6-lane divided highway with new overpass at Las Colinas Blvd. - a project of 0.6 miles. 

APM & Associates provided engineering services for the design to reconstruct Haskell Avenue from East Grand to Fitzhugh Avenue in Dallas as part of the 1991 Dallas County Bond program.

I.H. 635 (LBJ Freeway) Frontage Roads (Hillcrest Road to Merit Drive)

APM was selected by TxDOT, Dallas District, as prime consultant to provide Plans, Specifications and Estimate (PS&E) for the Early Frontage Roads project as part of the overall reconstruction of I.H. 635(LBJ Freeway). 